Skip to content
DataMatrix LabsDataMatrix Labs
Book a call

Work

How we run three kinds of project.

Worked examples of situations we see often, each in the same four parts.

  1. Where it starts
  2. What we do
  3. What we aim to change
  4. What comes after

Measurement

How we count a result before we report it.

  1. Rule 01

    Record the baseline first

    Before anything changes, over long enough to smooth out one good or bad week.

  2. Rule 02

    Define each metric once

    Leads, bookings and sales are defined up front and counted the same everywhere.

  3. Rule 03

    Compare like with like

    Same period length and season, with a note on anything else that moved.

  4. Rule 04

    Report what did not work

    Lost tests sit beside the wins, with what we plan to do about them.